Roadbuster Posted September 4, 2015 Report Share Posted September 4, 2015 I think your probably right mate, it'll be end of November before it gets built, another month of transport, that's new year already so I'll just wait and see now. Luckily I'm not desperate for it, I've sold my 6R and I use a Landy day to day for work etc. Build + Transport = 1 month, not 2 months Link to comment Share on other sites More sharing options...
Simon-R Posted September 4, 2015 Report Share Posted September 4, 2015 Just got build week confirmation for 5/10!!! Not sure what week number that is Does that mean I should have it early November? Link to comment Share on other sites More sharing options...
Jones_7r Posted September 4, 2015 Report Share Posted September 4, 2015 Just got build week confirmation for 5/10!!! Not sure what week number that is Does that mean I should have it early November? I'd say so, yes. What time did you receive it? Link to comment Share on other sites More sharing options...
Kennynbuster Posted September 4, 2015 Report Share Posted September 4, 2015 Picked it up last night after 11 weeks wait. Andig and stiggy786 2 Link to comment Share on other sites More sharing options...
Simon-R Posted September 4, 2015 Report Share Posted September 4, 2015 I'd say so, yes. What time did you receive it? 8.50am so it appears it's true about the notifications coming through between 8.45-9.00am Link to comment Share on other sites More sharing options...
Jones_7r Posted September 4, 2015 Report Share Posted September 4, 2015 8.50am so it appears it's true about the notifications coming through between 8.45-9.00amYeah mate haha. What spec you order? You get DSG & Prets? Link to comment Share on other sites More sharing options...
Simon-R Posted September 4, 2015 Report Share Posted September 4, 2015 Yeah mate haha. What spec you order? You get DSG & Prets? Yeah LSG, DSG, Prets, Nav, Keyless, DCC Link to comment Share on other sites More sharing options...
mitchellinman Posted September 4, 2015 Report Share Posted September 4, 2015 Finally my bw35 is in transit!!! Must have been backlog delays from the factory shutdown. Link to comment Share on other sites More sharing options...
Simon-R Posted September 4, 2015 Report Share Posted September 4, 2015 Anyone else notice the build week being different on the online tracker versus the email. Email says 5th October. Tracker says 28th Sept?? Hope it's the earlier one! Link to comment Share on other sites More sharing options...
Rowan83 Posted September 4, 2015 Report Share Posted September 4, 2015 Anyone else notice the build week being different on the online tracker versus the email. Email says 5th October. Tracker says 28th Sept?? Hope it's the earlier one! I noticed this... The online tracker stated build week commencing 24/08/15 but the email said 31/08/15..... It turned out to be 31/08/15. I got a message yesterday saying the car is now in transit on its way to the UK Link to comment Share on other sites More sharing options...
bojinov29 Posted September 5, 2015 Report Share Posted September 5, 2015 (edited) Anyone know how long it is between getting your confirmed build week and that week actually arriving? Is there a set amount of weeks? Many thanks, Phil Edited September 5, 2015 by bojinov29 Link to comment Share on other sites More sharing options...
Simon-R Posted September 5, 2015 Report Share Posted September 5, 2015 Anyone know how long it is between getting your confirmed build week and that week actually arriving? Is there a set amount of weeks? Many thanks, Phil Yeah it takes about a week to build then 3-4 weeks after to arrive at dealer. Link to comment Share on other sites More sharing options...
bojinov29 Posted September 5, 2015 Report Share Posted September 5, 2015 Yeah it takes about a week to build then 3-4 weeks after to arrive at dealer. Cheers for the reply Simon ... still a little confused (not with your reply) got an unconfirmed bw 40 off vwcs this week ... just wondering how much notification you get off vw prior to getting the build week confirmed, just hoping it doesn't slip again tbh the waiting is killing me. Link to comment Share on other sites More sharing options...
Simon-R Posted September 5, 2015 Report Share Posted September 5, 2015 Cheers for the reply Simon ... still a little confused (not with your reply) got an unconfirmed bw 40 off vwcs this week ... just wondering how much notification you get off vw prior to getting the build week confirmed, just hoping it doesn't slip again tbh the waiting is killing me. I was told you'll get the build week confirmed 4 weeks before it's due to be built. That tallied with what happened to me. VW said that it can sometimes be 2 weeks before so you never really know. It's so frustrating, I was at the dealer last week all ready to buy a used car and then my text notification came through saying build week confirmed!! When did you order Phil? Link to comment Share on other sites More sharing options...
bojinov29 Posted September 5, 2015 Report Share Posted September 5, 2015 I was told you'll get the build week confirmed 4 weeks before it's due to be built. That tallied with what happened to me. VW said that it can sometimes be 2 weeks before so you never really know. It's so frustrating, I was at the dealer last week all ready to buy a used car and then my text notification came through saying build week confirmed!! When did you order Phil? First week in May ... I know that really ain't to long going off some of the unfortunate story's some of the lads have gone through but it's still frustrating all the same. Got told it'd be ready for Sept when I ordered but now looking at early November if all goes well. Link to comment Share on other sites More sharing options...